PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Sanitary-waste piping going into the 2nd floor bathroom 234 Facing North.jpg Started laying out block at the detention cells Facing South-East.jpg Bathroom 220 roughing Facing North-West.jpg Bathroom 234 Roughing Facing West.jpg Continued installing ductwork at the 3rd floor Facing East.jpg Hot water supply - return piping at the 4th floor Facing West.jpg Installed metal clips along the top roof perimeter for the parapet Facing East.jpg Installed sheet rock at the lower roof Facing West.jpg Installed the hot water supply and return at the 2nd - 4th floor Facin West.jpg
Previous pageNext page Continued installing ductwork at the 3rd floor Facing East
Continued installing ductwork at the 3rd floor Facing East